A NEW BUILDING IS GETTING READY FOR COMMISSIONING
59
Time read: 1 min
BELGOROD State Technological University named after Shukhov is preparing to open a new academic and laboratory building of the Center for Construction Innovations (building No. 7)
Production and testing equipment is being purchased, installation work and technical equipment are at the completion stage.
Already in the summer, classes on new construction technologies (information modeling (BIM), additive technologies, biopositive materials and composites, Smart Home systems) will be held there for BSTU students.
The building accommodates classrooms, workshops and laboratories.